Transmission rebuild, measuring clearances before reassembly.Engine pulled and on the lift for a rebuild.Turbo rebuild: new billet cartridge replacing the damaged original.Timing chain and guide replacement.Front-mount intercooler upgrade.Fuel injectors out for cleaning and testing.Supercharger removal on a 3.0T.Coilover and big brake install on an R8.R8 up on the lift for suspension work.